Alvarado Junior High consisted of two additions on opposing sides of the campus and minor renovations to the occupied campus. The smaller of the two additions was a 5,000 SF band hall addition that consists of a new music room, percussion room, and a multipurpose classroom. The larger of the two additions was a 26,000 SF two-story classroom addition containing multiple collaboration areas, 12 classrooms, and three science labs. The classroom addition also contains an outdoor learning space with extensive landscaping and gathering space. The additions ran simultaneously and were completed in 10 months.